Procuring agency: Department of Planning and Investment of Bac Giang province

Project name: Social housing area no. 02 in areas no. 5, no. 9 in the southern urban area of Bac Giang city “Notice ref No PR2200030881 - 00. Date of publication: 17/01/2023 16:36"

Investment objectives: Invest in building social housing area no. 02 in areas no. 5, no. 9 in the southern urban area of Bac Giang city in order to gradually implement the construction master plan of Bac Giang city, Bac Giang province to 2035; implement the detailed construction plan of zones 5 and 9 in the southern urban area of Bac Giang city approved by the People's Committee of Bac Giang province and the housing development program of Bac Giang province to 2030; housing development plan for 2022 and 2021-2025 in the province, contribute to ensuring stable accommodation for beneficiaries of social housing policies. When the project is completed and put into use, it will solve the accommodation needs for about 2,642 people

Project scale: Construction of 03 housing projects, with a total construction area of 4,828m2, total construction floor area of 94,342m2. In which: Social housing (02 buildings) is built on a land area of about 9,656m2, construction area is about 3862.4m2, total construction floor area is about 74,033.3m2, with 19 floors (01 basement), the number of social housing apartments is expected to be about 1036 units; commercial housing (01 building) is built on a land area of about 2,414m2 (equivalent to 20% of the residential land area of the whole project), the construction area is about 965.6m2, total construction floor area is about 20,308.3m2, with 19 floors (02 basements), the number of apartments is expected to be about 237. The functional spaces in the buildings include: Residential apartments; community space; parking space; common public and technical spaces serve the whole building. The engineering system of the project includes: Electrical, lightning protection, lighting system; communication information system; garbage collection system; ventilation system; water supply and drainage systems; fire protection system. - Items of technical infrastructure outside the house (power supply, water supply, rainwater drainage, wastewater drainage, fire protection, communication) and landscaped gardens within the land lot B-OXH -2 which are complete and synchronous

Project implementation progress: 1. Project operation duration: 50 years from the date the competent authority approves the Investor. 2. Project implementation progress: Complete construction procedures; Complete construction works: 24 months from the date of investor approval

Project location: Dinh Ke commune, Bac Giang City, Bac Giang province; Tan Tien commune, Bac Giang City, Bac Giang province

Land area: About 1,207ha

Land use's purpose: Investment in construction of social housing projects

Current status of the land area: The investment project on construction of social housing in areas No. 5 and 9 in the southern urban area, Bac Giang city according to the approved detailed plan has been invested in technical infrastructure (ground leveling). Around the land lot B-OXH-2, the technical infrastructure has been fully invested in the project: Areas No. 5, 9 in the Southern urban area, Bac Giang city. At the present time, the land lot B-OXH-2 belonging to the project of Areas No. 5, 9 in the Southern urban area, Bac Giang city has been handed over to the People's Committee of Bac Giang city for management

Preliminary total project implementation cost: VND 863.110.713.000

Compensation, support and resettlement expense: VND 13.223.969.000

Deadline for investors to submit their project implementation registration document: 24/02/2023 16:00

Address, phone number, fax number of the Department of Planning and Investment: Department of Planning and Investment of Bac Giang province, Nguyen Gia Thieu road, Tran Phu ward, Bac Giang city, Bac Giang province. Phone number: 02043854317.

Chuyên đề