Procuring agency: Thermal Power Project Management Board 3 (TPMB3)

Name of procurement Package No.05: Engineering, Procurement, Supply, Construction and Installation of Equipment and Materials associated with Plant Control System Upgrade Project (DCS) of Uong Bi Thermal Power Plant - Unit 300MW (Unit S7) (including Erection All Risks Insurance) (Notice ref No.: IB2300019749 - 00. Date of publication: 15/02/2023 10:51)

- Implementation period: 460 days

Project name: Upgrade of the plant control system (DCS)- Uong Bi Thermal Power Plant Project

Source of fund: EVNGENCO1’s construction investment

Method of bidder selection: International open bidding, one-stage two envelope bidding

Time of issuing bidding documents: from 10:51 am, 15 February 2023 to 09:00 am, 18 April 2023 (during office hours)

Place of issuing bidding documents: muasamcong.mpi.gov.vn

Price of bidding documents: VND 2,000,000

Bid security: VND 3,200,000,000 or USD 135,500 through banks or branches which legally operate in Viet Nam

Bid closing time: 09:00 am, 18 April 2023

Bid opening time: 10:00 am, 18 April 2023

Chuyên đề