Investment objectives: To gradually concretize the general construction planning of Phu Ly city to 2030, with a vision to 2050, contributing to promoting the completion of the modern and synchronous Phu Ly urban infrastructure system, striving to become a city by 2030. Phu Ly street meets the criteria of grade I urban area; Forming a spacious new urban area, synchronous infrastructure system, with beautiful landscape architecture, in harmony between the new development area and the existing residential area, creating an ideal living and working space; improve the efficiency of land use, meet the demand for housing; increase the land fund for resettlement for projects in the city; contribute to increase state budget revenue and promote local socio-economic development
Project scale: Technical infrastructure projects: - Leveling: Leveling the ground according to the planning and ensuring synchronous connection with the current residential area (excluding the volume of leveling the area of works not proposed for investment in the project and handing over to the locality to manage ). - Technical infrastructure system: Road system (in which: Nguyen Van Cu road only completes investment of 5.0m in the northern summer within the scope of the project proposal), car park, drinking water supply operation and fire fighting, storm water drainage system, wastewater drainage and sanitation system, return of canals, power supply system, communication system, landscape trees (walkways, renovating tanks trees, renovating lakes) ... on the basis of compliance with the criteria of detailed construction planning scale 1/500 approved within the boundaries of project implementation. * Housing projects: - Invest in construction (rough construction to complete the exterior) of low-rise housing projects (attached houses) on Nguyen Van Cu and D4 streets, including 114 houses with a total area of about 15,604m2, high-rise building. building 05 floors, construction density 80%. - Investment in construction and completion of social housing with an area of about 16,491.8m2, construction density of 40%, 5-storey high-rise building. - Resettlement residential land area (total area of about 8,509.2m2), including: 2,877.2m2 of land fund in resettlement lots 1 and 2 according to detailed planning on route D4 and 5,632m2 of land converted from adjacent residential land into residential land for resettlement at Lots LK19, LK20 on D7, D9 roads. After completing site clearance, leveling, handing over to state agencies for management to arrange resettlement land for households according to regulations. * Other social and public infrastructure works: - Community house: Invest in building 01 community house in the planned land lot with symbol SHCD2 with a total area of 1,316.5 m2.
Project summary: To invest in building Tay Phu Van new urban area, Phu Ly city - the area north of Nguyen Van Cu street (PL-DT04.22); the land use structure according to the criteria of the detailed planning of 1/500 scale of Tay Phu Van new urban area, Phu Ly city has been approved, the project investment policy has been approved and proposed for implementation. project
Project implementation progress: Project implementation progress: 2022-2027. - Project operation duration: no more than 50 years (from the date on which the investor is granted a decision on land allocation, land lease, or decision on change of land use purpose)
Project location: Phu Van commune, Phu Ly City, Ha Nam province
Land area: 23.38ha
Land use period: New residential land: Buyers of land and houses attached to residential land use rights may use land stably and long-term. - Land for public and commercial works: The land lease term shall not exceed 50 years
Land use's purpose: including new residential land group; Public land, services; School public land; Commercial public land; Green land, technical infrastructure, traffic, parking, religion, belief, cemetery status, isolated trees
Approved planning criteria: The structure of land use includes: Residential land 76,435.4 m2 (adjacent residential land 51,434.4m2, resettlement residential land 8,509.2m2, social housing land 16,491.8m2); Public and service land 2,040.5 m2; School public land 8,638.9 m2; Commercial public land 9,178.9 m2; Green land 17,895.2 m2; Technical infrastructure land 9,116.9 m2; Land for traffic and parking 103,832.1 m2; Land for religion and belief 2,050.3 m2; Current cemetery land, isolated green trees 4,585.9 m2. - The norms on spatial organization of landscape architecture and urban design, planning of technical infrastructure system: comply with the provisions of the approved 1/500 detailed planning
Current status of the land area: -
Preliminary total project implementation cost: VND 910.611.400.000
Compensation, support and resettlement expense: VND 82.408.400.000
Deadline for investors to submit their project implementation registration document: 16/01/2023 15:00
Address, phone number, fax number of the Department of Planning and Investment: Department of Planning and Investment of Ha Nam province, 15 Tran Phu road, Quang Trung ward, Phu Ly city, Ha Nam province. Phone number: 03513852701