Project Management Unit No.6: Dien Chau – Bai Vot section construction investment subproject under the Project for construction of some sections on the Eastern

Project Management Unit No.6 issued on May 06, 2019 its notice of bid invitation for project of Dien Chau – Bai Vot section construction investment subproject under the Project for construction of some sections on the Eastern North - South Expressway for 2017-2020 period  with details as follows:

Name of the procuring entity: Project Management Unit No.6

Brief description of the project:

- Project name: Dien Chau – Bai Vot section construction investment subproject under the Project for construction of some sections on the Eastern North - South Expressway for 2017-2020 period “http://muasamcong.mpi.gov.vn. Notice ref No.: 20190510288 - 00. Date of publication: 06/05/2019 09:52”

- Projected site: Dien Chau, Nghi Loc and Hung Nguyen districts of Nghe An province and Duc Tho district of Ha Tinh province.

- Projected implementation period: It is expected to start construction in 2019, be basically completed in 2021. Payback period: About 20 years 04 months

- Estimated total investment capital: VND 13.338.000.000.000    

- Project objectives: Project construction investment objectives are gradually to take form the eastern North-South expressway with a large capacity, safety and high speed, meeting transport demand and being suitable to transport development planning and orientation; linking the economic and political centers of Thanh Hoa, Nghe An provinces in particular and the Northern Central region in general.

- Project modules: Construction about 49.30 km of expressway section from Km430+000 to Km479+300. In the completion stage, the expressway has the scale of 6 lanes with the embankment width Bembankment = 32.25m. In the phasing stage, it has the scale of 4 lanes with the embankment width Bembankment = 17m. + Total 32 bridges, including 23 bridges on the expressway, 05 overpasses on the expressway, 3 bridges in the interchange and 01 bridge on the frontage road will be constructed. + 01 tunnel: Than Vu tunnel (right branch tunnel is about 1120m long, left branch tunnel is about 1072m long) will be constructed on the route

- Type contract: BOT

- State funding for project (if any): VND 8.077.000.000.000

Selection method: international open bidding with prequalification

Time of issuing prequalification document: from 10:00 am, 09 May 2019 to 10:00 am, 08 July 2019 (during office hours)

Place of issuing prequalification document: Project Management Unit No.6, No.1002 (10th Floor), DRVN Building, Lot D20, Ton That Thuyet street, Cau Giay district, Ha Noi

Price of prequalification document: VND 10,000,000

Bid closing time: 10:00 am, 08 July 2019

Bid opening time: 10:30 am, 08 July 2019.