Tien Giang Department of Construction: Waste treatment plant at Tan Lap 1 landfill, Tan Phuoc district

Tien Giang Department of Construction issued on July 11, 2019 its notice of bid invitation for project of Waste treatment plant at Tan Lap 1 landfill, Tan Phuoc district with details as follows:

Name of the procuring entity: Tien Giang Department of Construction

Brief description of the project:

- Project name: Waste treatment plant at Tan Lap 1 landfill, Tan Phuoc district "Notice ref No.: 20190729533 - 02. Date of publication: 11/07/2019 14:00"

- Projected site: Tan Lap commune, Tan Phuoc district, Tien Giang province; 2 ha.

- Estimated total investment capital: VND 263,500,000,000

- Project objectives: To build a factory to handle daily-life solid waste, and gradually process the existing garbage volume at the landfill with advanced technology, make use of waste and minimize burial.

- State funding for project (if any): None

Selection method: international open bidding with prequalification

Time of issuing prequalification document: from 2:30 pm, 16 July 2019 to 2:30 pm, 16 August 2019 (during office hours)

Place of issuing prequalification document: Tien Giang Department of Construction, No. 4, Le Loi Street, Ward 1, My Tho City, Tien Giang Province.

Price of prequalification document: VND 10,000,000

Bid closing time: 2:30 pm, 16 August 2019

Bid opening time: 3:00 pm, 16 August 2019.