Name of the procuring entity: Hoa Binh Department of Construction
Brief description of the project:
- Project name: Residential area of Quarter 10, Hang Tram Town, Yen Thuy District, Hoa Binh Province "Notice ref No.: 20200335908 - 01. Date of publication: 16/03/2020 15:23"
- Projected site: Quarter 10, Hang Tram Town, Yen Thuy District, Hoa Binh Province; Current status of the land: Arable land for cereals; the ground has not been cleared. Specific location: + In the Northeast: Adjacent to residential area. + In the Southeast: Adjacent to urban roads and residential area. + In the Northwest: Adjacent to urban roads. + In the Southwest: Adjacent to residential area. 28.945,0 m2.
- Estimated total investment capital: VND 243,757,030,000
- Project objectives: To build a synchronous residential area on technical infrastructure system, including: Leveling; transportation system; electricity distribution system; water supply system; drainage system and rough construction to complete the exterior of residential buildings, in order to partially meet housing development needs of Yen Thuy District as well as Hoa Binh province, contributing to the urban development process for Yen Thuy District in particular and of Hoa Binh province in general, increasing the attractiveness in the investment environment and generating revenue for the budgets at all levels.
- State funding for project (if any): None
Selection method: international open bidding with prequalification
Time of issuing prequalification document: from 03:20 pm, 16 March 2020 to 08:30 am, 20 April 2020 (during office hours)
Place of issuing prequalification document: Hoa Binh Department of Construction, Ly Nam De street, Tan Thinh ward, Hoa Binh city, Hoa Binh province. Tel: 02183 8854206; Fax: 02183 881433.
Price of prequalification document: VND 10,000,000
Bid closing time: 08:30 am, 20 April 2020
Bid opening time: 09:00 am, 20 April 2020.